IN conducting final checks on the recently re-installed flash gas compressor at the Liza Destiny Floating Production Storage and Offloading (FPSO) vessel, offshore Guyana, ExxonMobil encountered another issue, which has since forced the oil giant to slash its production temporarily by at least 75 per cent.
According to information from ExxonMobil, its regular daily production of about 120,000 barrels has been reduced to 30,000 per day, a decrease of 90,000 barrels.
“We have reduced production to a minimum level that mitigates formation of hydrates in subsea systems, maintains gas injection and fuel gas to the power generators, and minimises flare,” ExxonMobil’s Public and Government Affairs Adviser, Janelle Persaud, said in an official update, on Tuesday.
According to Persaud, production was reduced significantly because the company encountered problems related to the discharge silencer, which is a component of the recently re-installed flash gas compressor.
According to information from ExxonMobil, its regular daily production of about 120,000 barrels has been reduced to 30,000 per day, a decrease of 90,000 barrels.
“We have reduced production to a minimum level that mitigates formation of hydrates in subsea systems, maintains gas injection and fuel gas to the power generators, and minimises flare,” ExxonMobil’s Public and Government Affairs Adviser, Janelle Persaud, said in an official update, on Tuesday.
According to Persaud, production was reduced significantly because the company encountered problems related to the discharge silencer, which is a component of the recently re-installed flash gas compressor.